CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/super-queens/
normalized-super-queens-4.xml

Jump to solvers results

General information on the benchmark

Namecsp/super-queens/
normalized-super-queens-4.xml
MD5SUM86f27dad5b32c8754684e5fda2e6b575
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark1.66975
Satisfiable
(Un)Satisfiability was proved
Number of variables240
Number of constraints21540
Maximum constraint arity2
Maximum domain size120
Number of constraints which are defined in extension0
Number of constraints which are defined in intension21540
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2082073UNSAT 1.66975 1.67233
pcs 0.3.2 (complete)2082065UNSAT 2.06269 2.08084
pcs-restart 0.3.2 (complete)2082066UNSAT 2.21866 2.25085
Abscon 112v4 AC (complete)2097571UNSAT 6.577 6.69454
Abscon 112v4 ESAC (complete)2097572UNSAT 6.66698 6.79497
bpsolver 09 (complete)2082074UNSAT 111.353 112.216
SAT4J CSP 2.1.1 (complete)2082064? 1107.15 1118.64
Sugar v1.14.6+picosat (complete)2082070? (TO) 1800.01 1817.29
Concrete DC 2009-07-14 (complete)2082068? (TO) 1800.04 1815.62
Concrete 2009-07-14 (complete)2082067? (TO) 1800.04 1807.32
Choco2.1.1 2009-06-10 (complete)2082069? (TO) 1800.09 1803.37
Choco2.1.1b 2009-07-16 (complete)2116697? (TO) 1800.12 1809.08
Sugar v1.14.6+minisat (complete)2082071? (TO) 1800.14 1816.43

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: