CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/super-queens/
normalized-super-queens-8.xml

Jump to solvers results

General information on the benchmark

Namecsp/super-queens/
normalized-super-queens-8.xml
MD5SUMcd97e8f7f9b4ac982d62b737eb37200e
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.038993
Satisfiable
(Un)Satisfiability was proved
Number of variables40
Number of constraints590
Maximum constraint arity2
Maximum domain size20
Number of constraints which are defined in extension0
Number of constraints which are defined in intension590
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2082051UNSAT 0.038993 0.040268
pcs-restart 0.3.2 (complete)2082044UNSAT 0.063989 0.0702549
pcs 0.3.2 (complete)2082043UNSAT 0.065989 0.070791
bpsolver 09 (complete)2082052UNSAT 0.180971 0.192221
Abscon 112v4 ESAC (complete)2097568UNSAT 1.03684 1.04797
Abscon 112v4 AC (complete)2097567UNSAT 1.07184 1.1068
Choco2.1.1b 2009-07-16 (complete)2116695UNSAT 1.2798 1.31036
Choco2.1.1 2009-06-10 (complete)2082047UNSAT 1.45578 1.49234
Concrete DC 2009-07-14 (complete)2082046? (TO) 1800.04 1800.73
Concrete 2009-07-14 (complete)2082045? (TO) 1800.07 1800.73
Sugar v1.14.6+minisat (complete)2082049? (TO) 1800.08 1801.52
Sugar v1.14.6+picosat (complete)2082048? (TO) 1800.09 1808.52
SAT4J CSP 2.1.1 (complete)2082042? (TO) 1800.27 1814.55

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: