CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/super-queens/
normalized-super-queens-14.xml

Jump to solvers results

General information on the benchmark

Namecsp/super-queens/
normalized-super-queens-14.xml
MD5SUM14c2fce2e4d4e8fdcde4ad542c4fc2d2
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.687894
Satisfiable
(Un)Satisfiability was proved
Number of variables160
Number of constraints9560
Maximum constraint arity2
Maximum domain size80
Number of constraints which are defined in extension0
Number of constraints which are defined in intension9560
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2082040UNSAT 0.687894 0.690214
pcs 0.3.2 (complete)2082032UNSAT 0.901862 0.909408
pcs-restart 0.3.2 (complete)2082033UNSAT 0.906861 0.921473
Abscon 112v4 AC (complete)2097565UNSAT 3.46747 3.55103
Abscon 112v4 ESAC (complete)2097566UNSAT 3.58145 3.65375
bpsolver 09 (complete)2082041UNSAT 16.4505 16.5997
Choco2.1.1b 2009-07-16 (complete)2116694UNSAT 32.61 32.9517
Choco2.1.1 2009-06-10 (complete)2082036UNSAT 32.781 32.979
SAT4J CSP 2.1.1 (complete)2082031? 261.909 263.192
Sugar v1.14.6+minisat (complete)2082038? (TO) 1800.02 1807.59
Concrete 2009-07-14 (complete)2082034? (TO) 1800.03 1804.92
Sugar v1.14.6+picosat (complete)2082037? (TO) 1800.04 1815.14
Concrete DC 2009-07-14 (complete)2082035? (TO) 1800.06 1804.03

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: