CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/rlfapScensMod/
normalized-scen1-f9.xml

Jump to solvers results

General information on the benchmark

Namecsp/rlfapScensMod/
normalized-scen1-f9.xml
MD5SUM3933015e701222af96ea6a914713e869
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.753885
Satisfiable
(Un)Satisfiability was proved
Number of variables916
Number of constraints5548
Maximum constraint arity2
Maximum domain size35
Number of constraints which are defined in extension0
Number of constraints which are defined in intension5548
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2081842UNSAT 0.753885 0.758926
Abscon 112v4 AC (complete)2097529UNSAT 5.16921 5.21659
Choco2.1.1b 2009-07-16 (complete)2116676UNSAT 5.59115 5.63088
Abscon 112v4 ESAC (complete)2097530UNSAT 5.66314 5.73872
Choco2.1.1 2009-06-10 (complete)2081838UNSAT 6.32504 6.39881
Concrete 2009-07-14 (complete)2081836UNSAT 8.14276 8.28248
Sugar v1.14.6+minisat (complete)2081840UNSAT 9.81051 10.0308
Sugar v1.14.6+picosat (complete)2081839UNSAT 12.3191 12.4467
SAT4J CSP 2.1.1 (complete)2081833UNSAT 19.2971 19.5105
Concrete DC 2009-07-14 (complete)2081837UNSAT 133.74 135.241
pcs 0.3.2 (complete)2081834UNSAT 279.13 280.532
pcs-restart 0.3.2 (complete)2081835UNSAT 312.466 314.856
bpsolver 09 (complete)2081843? (TO) 1800.02 1807.11

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: