CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/super-js/super-js-taillard-20/
normalized-super-js-taillard-20-28.xml

Jump to solvers results

General information on the benchmark

Namecsp/super-js/super-js-taillard-20/
normalized-super-js-taillard-20-28.xml
MD5SUM5e35e44ffc93b7d1cb552d0f7ecb97a7
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark20.8368
Satisfiable
(Un)Satisfiability was proved
Number of variables800
Number of constraints12940
Maximum constraint arity2
Maximum domain size1551
Number of constraints which are defined in extension0
Number of constraints which are defined in intension12940
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
bpsolver 09 (complete)2081766UNSAT 20.8368 21.0349
Choco2.1.1 2009-06-10 (complete)2081761UNSAT 212.605 214.668
Choco2.1.1b 2009-07-16 (complete)2116669UNSAT 231.1 234.651
Sugar v1.14.6+minisat (complete)2081763UNSAT 579.202 584.978
Sugar v1.14.6+picosat (complete)2081762UNSAT 1393.67 757.986
SAT4J CSP 2.1.1 (complete)2081756? 228.086 228.231
Concrete DC 2009-07-14 (complete)2081760? 409.747 412.735
Abscon 112v4 ESAC (complete)2097516? (TO) 1800.07 1803.85
Mistral 1.545 (complete)2081765? (TO) 1800.08 1800.82
Concrete 2009-07-14 (complete)2081759? (TO) 1800.09 1809.02
pcs 0.3.2 (complete)2081757? (TO) 1800.11 1802.83
pcs-restart 0.3.2 (complete)2081758? (TO) 1800.15 1810.54
Abscon 112v4 AC (complete)2097515? (TO) 1800.2 1809.2

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: