CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/super-js/super-js-taillard-20-15/
normalized-super-js-taillard-20-15-24.xml

Jump to solvers results

General information on the benchmark

Namecsp/super-js/super-js-taillard-20-15/
normalized-super-js-taillard-20-15-24.xml
MD5SUM32c080069cd6a9f51c8c0a6f1b619a56
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark3.9544
Satisfiable
(Un)Satisfiability was proved
Number of variables600
Number of constraints9690
Maximum constraint arity2
Maximum domain size1288
Number of constraints which are defined in extension0
Number of constraints which are defined in intension9690
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
bpsolver 09 (complete)2081623UNSAT 3.9544 3.9946
Choco2.1.1 2009-06-10 (complete)2081618UNSAT 64.6702 65.327
Choco2.1.1b 2009-07-16 (complete)2116656UNSAT 70.1893 70.901
Concrete DC 2009-07-14 (complete)2081617? 218.584 218.683
SAT4J CSP 2.1.1 (complete)2081613? 250.032 250.971
Sugar v1.14.6+picosat (complete)2081619? (TO) 1800.03 1810.75
Mistral 1.545 (complete)2081622? (TO) 1800.04 1802.51
Concrete 2009-07-14 (complete)2081616? (TO) 1800.05 1801.92
pcs 0.3.2 (complete)2081614? (TO) 1800.09 1803.43
Abscon 112v4 AC (complete)2097489? (TO) 1800.11 1808.85
pcs-restart 0.3.2 (complete)2081615? (TO) 1800.11 1814.43
Sugar v1.14.6+minisat (complete)2081620? (TO) 1800.12 1814.04
Abscon 112v4 ESAC (complete)2097490? (TO) 1800.17 1815.97

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: