CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/super-js/super-js-taillard-20-15/
normalized-super-js-taillard-20-15-28.xml

Jump to solvers results

General information on the benchmark

Namecsp/super-js/super-js-taillard-20-15/
normalized-super-js-taillard-20-15-28.xml
MD5SUM0ee4188de7d6c5919718ac5c6628a5b8
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark4.49032
Satisfiable
(Un)Satisfiability was proved
Number of variables600
Number of constraints9690
Maximum constraint arity2
Maximum domain size1360
Number of constraints which are defined in extension0
Number of constraints which are defined in intension9690
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
bpsolver 09 (complete)2081590UNSAT 4.49032 4.51856
Choco2.1.1 2009-06-10 (complete)2081585UNSAT 101.197 101.737
Choco2.1.1b 2009-07-16 (complete)2116653UNSAT 174.871 176.54
Concrete DC 2009-07-14 (complete)2081584? 161.699 163.104
SAT4J CSP 2.1.1 (complete)2081580? (exit code) 223.152 223.314
Concrete 2009-07-14 (complete)2081583? (TO) 1800.07 1809.32
Sugar v1.14.6+picosat (complete)2081586? (TO) 1800.07 1808.36
pcs 0.3.2 (complete)2081581? (TO) 1800.07 1811.03
Abscon 112v4 ESAC (complete)2097484? (TO) 1800.08 1808.97
pcs-restart 0.3.2 (complete)2081582? (TO) 1800.09 1801.94
Mistral 1.545 (complete)2081589? (TO) 1800.1 1804.01
Sugar v1.14.6+minisat (complete)2081587? (TO) 1800.13 1811.75
Abscon 112v4 AC (complete)2097483? (TO) 1800.25 1801.64

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: