CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/super-js/super-js-taillard-15/
normalized-super-js-taillard-15-21.xml

Jump to solvers results

General information on the benchmark

Namecsp/super-js/super-js-taillard-15/
normalized-super-js-taillard-15-21.xml
MD5SUM11fa157cba8e1d54b2e29b7001f2eb89
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark2.01869
Satisfiable
(Un)Satisfiability was proved
Number of variables450
Number of constraints5580
Maximum constraint arity2
Maximum domain size1185
Number of constraints which are defined in extension0
Number of constraints which are defined in intension5580
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
bpsolver 09 (complete)2081524UNSAT 2.01869 2.04059
Choco2.1.1 2009-06-10 (complete)2081519UNSAT 18.2342 18.4162
Sugar v1.14.6+minisat (complete)2081521UNSAT 21.2528 21.7624
Choco2.1.1b 2009-07-16 (complete)2116647UNSAT 22.0327 22.2781
Sugar v1.14.6+picosat (complete)2081520UNSAT 40.0799 40.8036
Concrete DC 2009-07-14 (complete)2081518? 198.216 200.438
SAT4J CSP 2.1.1 (complete)2081514? 269.78 270.895
Concrete 2009-07-14 (complete)2081517? (TO) 1800.02 1815.02
pcs-restart 0.3.2 (complete)2081516? (TO) 1800.06 1804.84
Mistral 1.545 (complete)2081523? (TO) 1800.1 1803.71
pcs 0.3.2 (complete)2081515? (TO) 1800.11 1807.94
Abscon 112v4 ESAC (complete)2097472? (TO) 1800.15 1808.65
Abscon 112v4 AC (complete)2097471? (TO) 1800.19 1801.98

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: