CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/largeQueens/
normalized-queens-500.xml

Jump to solvers results

General information on the benchmark

Namecsp/largeQueens/
normalized-queens-500.xml
MD5SUM2f41b36922ebee8c6bbe2e06a2cfd3a7
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmark
Best CPU time to get the best result obtained on this benchmark
Satisfiable
(Un)Satisfiability was proved
Number of variables500
Number of constraints124750
Maximum constraint arity2
Maximum domain size500
Number of constraints which are defined in extension0
Number of constraints which are defined in intension124750
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
pcs 0.3.2 (complete)2081471? 88.8945 89.7634
pcs-restart 0.3.2 (complete)2081472? 150.641 152.114
SAT4J CSP 2.1.1 (complete)2081470? 370.944 372.444
Concrete 2009-07-14 (complete)2081473? 1529.53 1544.05
bpsolver 09 (complete)2081480? (problem) 658.071 660.905
Sugar v1.14.6+minisat (complete)2081477? (MO) 24.95 25.1088
Sugar v1.14.6+picosat (complete)2081476? (MO) 28.0171 29.2042
Choco2.1.1 2009-06-10 (complete)2081475? (MO) 65.0041 65.3451
Concrete DC 2009-07-14 (complete)2081474? (TO) 1585.15 2000.02
Mistral 1.545 (complete)2081479? (TO) 1800.08 1815.03
Choco2.1.1b 2009-07-16 (complete)2116643? (TO) 1800.22 1800.95
Abscon 112v4 ESAC (complete)2097464? (TO) 1800.24 1812.35
Abscon 112v4 AC (complete)2097463? (TO) 1800.26 1807.06

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: