CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/queenAttacking/
normalized-queenAttacking-6.xml

Jump to solvers results

General information on the benchmark

Namecsp/queenAttacking/
normalized-queenAttacking-6.xml
MD5SUM329ec630f18fe773f393b0bd33b7aab7
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark8.59869
Satisfiable
(Un)Satisfiability was proved
Number of variables37
Number of constraints641
Maximum constraint arity2
Maximum domain size36
Number of constraints which are defined in extension0
Number of constraints which are defined in intension641
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Concrete DC 2009-07-14 (complete)2081364SAT 8.59869 8.71269
Choco2.1.1b 2009-07-16 (complete)2116633SAT 21.7347 21.7608
Concrete 2009-07-14 (complete)2081363SAT 46.7769 47.2743
Mistral 1.545 (complete)2081369SAT 67.1428 67.6558
Choco2.1.1 2009-06-10 (complete)2081365SAT 105.537 106.541
SAT4J CSP 2.1.1 (complete)2081360SAT 121.127 121.198
Sugar v1.14.6+picosat (complete)2081366SAT 157.349 158.924
Sugar v1.14.6+minisat (complete)2081367SAT 162.827 163.722
bpsolver 09 (complete)2081370? (problem) 0.112982 0.114965
Abscon 112v4 AC (complete)2097443? (TO) 1800.12 1814.24
pcs-restart 0.3.2 (complete)2081362? (TO) 1800.12 1802.55
pcs 0.3.2 (complete)2081361? (TO) 1800.14 1802.86
Abscon 112v4 ESAC (complete)2097444? (TO) 1800.15 1802.33

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
14 31 20 7 15 4 8 0 13 24 32 28 17 21 29 33 25 12 1 9 5 16 27 35 22 11 3 14 18 26 30 19 6 2 10 23 34