CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/renault/
normalized-renault-mgd_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/renault/
normalized-renault-mgd_ext.xml
MD5SUMd1d70ed5f0f747fe32a0d825239c31a3
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.415936
Satisfiable
(Un)Satisfiability was proved
Number of variables101
Number of constraints113
Maximum constraint arity10
Maximum domain size42
Number of constraints which are defined in extension113
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2080423SAT 0.415936 0.423984
pcs 0.3.2 (complete)2080415SAT 1.22181 1.24222
pcs-restart 0.3.2 (complete)2080416SAT 1.22681 1.24272
Abscon 112v4 ESAC (complete)2097272SAT 1.56176 1.57527
Abscon 112v4 AC (complete)2097271SAT 1.63175 1.69474
Concrete 2009-07-14 (complete)2080417SAT 3.43048 3.50221
Conquer 2009-07-10 (complete)2080422SAT 4.75728 4.98604
Sugar v1.14.6+picosat (complete)2080420SAT 7.31189 7.44322
Sugar v1.14.6+minisat (complete)2080421SAT 7.34288 7.44805
Choco2.1.1 2009-06-10 (complete)2080419SAT 10.9633 11.1069
Choco2.1.1b 2009-07-16 (complete)2116547SAT 11.7212 11.8687
bpsolver 09 (complete)2080424SAT 16.2095 16.3615
Concrete DC 2009-07-14 (complete)2080418SAT 62.4275 63.065
SAT4J CSP 2.1.1 (complete)2080414? 80.9737 79.9558

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
5 1 5 9 0 1 0 3 1 1 1 0 1 0 0 1 1 1 1 0 2 1 1 1 10 2 0 0 0 0 1 0 0 0 1 1 0 1 1 2 0 1 0 2 2 1 39 0 1 0 1 1 2 1 1 12 1 1 1 0 1 0 0 0 0 0 2 0 1
2 0 0 0 0 3 0 1 1 1 1 6 1 0 0 1 1 1 0 0 0 0 2 0 0 0 3 2 4 0 0 2