CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/js-taillard-20-15/
normalized-js-taillard-20-15-95-3.xml

Jump to solvers results

General information on the benchmark

Namecsp/js-taillard-20-15/
normalized-js-taillard-20-15-95-3.xml
MD5SUM716b48a774a2867588b51873634e2600
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.739887
Satisfiable
(Un)Satisfiability was proved
Number of variables300
Number of constraints3130
Maximum constraint arity2
Maximum domain size1288
Number of constraints which are defined in extension0
Number of constraints which are defined in intension3130
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
bpsolver 09 (complete)2080226UNSAT 0.739887 0.742959
Choco2.1.1 2009-06-10 (complete)2080221UNSAT 2.57461 2.62606
Choco2.1.1b 2009-07-16 (complete)2116529UNSAT 2.98455 3.9812
Concrete DC 2009-07-14 (complete)2080220? 250.225 252.574
SAT4J CSP 2.1.1 (complete)2080216? 309.142 311.479
Concrete 2009-07-14 (complete)2080219? (TO) 1800.03 1813.72
Sugar v1.14.6+picosat (complete)2080222? (TO) 1800.04 1813.33
Sugar v1.14.6+minisat (complete)2080223? (TO) 1800.1 1801.86
Mistral 1.545 (complete)2080225? (TO) 1800.11 1806.71
pcs 0.3.2 (complete)2080217? (TO) 1800.12 1810.85
pcs-restart 0.3.2 (complete)2080218? (TO) 1800.16 1803.36
Abscon 112v4 ESAC (complete)2097236? (TO) 1800.16 1810.19
Abscon 112v4 AC (complete)2097235? (TO) 1800.21 1811.61

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: