CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/radar-8-24-3-2/
normalized-radar-8-24-3-2-27.xml

Jump to solvers results

General information on the benchmark

Namecsp/radar-8-24-3-2/
normalized-radar-8-24-3-2-27.xml
MD5SUMcc07c0c823ab5d6cc2bd13553116745a
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.038993
Satisfiable
(Un)Satisfiability was proved
Number of variables144
Number of constraints64
Maximum constraint arity16
Maximum domain size4
Number of constraints which are defined in extension0
Number of constraints which are defined in intension64
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2080115SAT 0.038993 0.0427311
pcs-restart 0.3.2 (complete)2080108SAT 0.089985 0.097923
bpsolver 09 (complete)2080116SAT 0.090985 0.0948401
pcs 0.3.2 (complete)2080107SAT 0.093985 0.101276
Sugar v1.14.6+picosat (complete)2080112SAT 1.49077 1.58388
Sugar v1.14.6+minisat (complete)2080113SAT 1.65375 1.7392
Choco2.1.1b 2009-07-16 (complete)2116519SAT 2.17567 2.20004
Choco2.1.1 2009-06-10 (complete)2080111SAT 3.16052 3.24794
Abscon 112v4 AC (complete)2097215SAT 3.59445 3.59518
Abscon 112v4 ESAC (complete)2097216SAT 4.00239 4.07935
Concrete DC 2009-07-14 (complete)2080110SAT 82.0435 82.8294
Concrete 2009-07-14 (complete)2080109SAT 88.8285 89.7171
SAT4J CSP 2.1.1 (complete)2080106? 497.696 484.877

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
0 1 0 1 3 0 0 1 0 0 1 0 0 3 3 1 3 0 1 0 2 0 0 0 3 3 0 0 2 3 0 1 0 1 1 0 1 0 1 0 0 3 3 0 0 1 0 3 0 0 0 3 3 3 1 3 1 0 0 1 0 0 0 3 3 1 0 3 3 3
3 0 0 1 1 3 0 0 0 1 0 0 0 0 0 1 0 0 0 1 3 3 2 1 0 0 3 0 0 1 0 3 0 0 0 1 0 0 3 2 3 3 0 1 0 2 3 2 3 0 0 0 1 3 0 3 3 0 3 1 0 1 0 1 0 0 3 0 0 0
0 0 0 2