CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/rand-3-20-20/
normalized-rand-3-20-20-60-632-22_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/rand-3-20-20/
normalized-rand-3-20-20-60-632-22_ext.xml
MD5SUM3bc8c0707d4037ec121632cb9f65acc5
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark58.8751
Satisfiable
(Un)Satisfiability was proved
Number of variables20
Number of constraints59
Maximum constraint arity3
Maximum domain size20
Number of constraints which are defined in extension59
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2079543UNSAT 58.8751 59.3293
Concrete 2009-07-14 (complete)2079537UNSAT 167.798 169.476
Concrete DC 2009-07-14 (complete)2079538UNSAT 179.659 180.561
Choco2.1.1 2009-06-10 (complete)2079539UNSAT 289.249 290.737
Choco2.1.1b 2009-07-16 (complete)2116467UNSAT 317.513 319.407
Conquer 2009-07-10 (complete)2079542UNSAT 457.355 459.852
Abscon 112v4 ESAC (complete)2097112UNSAT 493.455 496.723
Abscon 112v4 AC (complete)2097111UNSAT 517.36 522.274
Sugar v1.14.6+minisat (complete)2079541UNSAT 1220.49 1226.35
pcs 0.3.2 (complete)2079535UNSAT 1381.41 1394.47
pcs-restart 0.3.2 (complete)2079536UNSAT 1758.33 1759.53
Sugar v1.14.6+picosat (complete)2079540? (TO) 1800.08 1811.63
bpsolver 09 (complete)2079544? (TO) 1800.09 1815.71
SAT4J CSP 2.1.1 (complete)2079534? (TO) 1801.05 1809.66

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: