Name | csp/ogdPuzzle/ normalized-crossword-m1-ogd-puzzle10.xml |
MD5SUM | cc3038c2e62940125f2c6aa42d3a26e2 |
Bench Category | N-ARY-INT (n-ary constraints in intension) |
Best result obtained on this benchmark | SAT |
Best CPU time to get the best result obtained on this benchmark | 0.132979 |
Satisfiable | |
(Un)Satisfiability was proved | |
Number of variables | 40 |
Number of constraints | 146 |
Maximum constraint arity | 14 |
Maximum domain size | 26 |
Number of constraints which are defined in extension | 20 |
Number of constraints which are defined in intension | 126 |
Global constraints used (with number of constraints) |
Solver Name | TraceID | Answer | CPU time | Wall clock time |
---|---|---|---|---|
Mistral 1.545 (complete) | 2078971 | SAT | 0.132979 | 0.140294 |
pcs 0.3.2 (complete) | 2078963 | SAT | 0.522919 | 0.535013 |
pcs-restart 0.3.2 (complete) | 2078964 | SAT | 0.995847 | 1.01232 |
Abscon 112v4 AC (complete) | 2097007 | SAT | 1.20582 | 1.25931 |
Abscon 112v4 ESAC (complete) | 2097008 | SAT | 1.59976 | 1.62963 |
bpsolver 09 (complete) | 2078972 | SAT | 2.79857 | 2.83018 |
Choco2.1.1 2009-06-10 (complete) | 2078967 | SAT | 4.19036 | 4.25047 |
Choco2.1.1b 2009-07-16 (complete) | 2116415 | SAT | 4.30834 | 4.39454 |
Concrete 2009-07-14 (complete) | 2078965 | SAT | 49.1235 | 49.6436 |
Concrete DC 2009-07-14 (complete) | 2078966 | SAT | 177.953 | 179.847 |
Sugar v1.14.6+minisat (complete) | 2078969 | SAT | 241.237 | 243.682 |
Sugar v1.14.6+picosat (complete) | 2078968 | SAT | 252.355 | 254.87 |
SAT4J CSP 2.1.1 (complete) | 2078962 | ? (TO) | 1800.16 | 1808.08 |
This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).
Solution found:19 4 2 15 18 19 19 0 14 14 10 0 2 14 12 12 20 0 19 15 11 0 17 14 12 0 19 4 3 20 18 6 0 25 0 25 19 0 2 4