Name | csp/ogdPuzzle/ normalized-crossword-m1-ogd-puzzle09.xml |
MD5SUM | 17e85ca07cd71388f77f756bb7ecb725 |
Bench Category | N-ARY-INT (n-ary constraints in intension) |
Best result obtained on this benchmark | SAT |
Best CPU time to get the best result obtained on this benchmark | 0.268959 |
Satisfiable | |
(Un)Satisfiability was proved | |
Number of variables | 35 |
Number of constraints | 55 |
Maximum constraint arity | 14 |
Maximum domain size | 26 |
Number of constraints which are defined in extension | 17 |
Number of constraints which are defined in intension | 38 |
Global constraints used (with number of constraints) |
Solver Name | TraceID | Answer | CPU time | Wall clock time |
---|---|---|---|---|
Mistral 1.545 (complete) | 2078938 | SAT | 0.268959 | 0.276336 |
pcs-restart 0.3.2 (complete) | 2078931 | SAT | 0.511921 | 0.519796 |
pcs 0.3.2 (complete) | 2078930 | SAT | 0.625904 | 0.635863 |
Abscon 112v4 ESAC (complete) | 2097002 | SAT | 1.24281 | 1.26822 |
Abscon 112v4 AC (complete) | 2097001 | SAT | 1.3168 | 1.36189 |
bpsolver 09 (complete) | 2078939 | SAT | 2.86656 | 2.88485 |
Choco2.1.1 2009-06-10 (complete) | 2078934 | SAT | 3.9614 | 4.0444 |
Choco2.1.1b 2009-07-16 (complete) | 2116412 | SAT | 4.06538 | 4.12654 |
Concrete 2009-07-14 (complete) | 2078932 | SAT | 65.791 | 66.2355 |
Concrete DC 2009-07-14 (complete) | 2078933 | SAT | 140.872 | 141.577 |
Sugar v1.14.6+picosat (complete) | 2078935 | SAT | 190.019 | 191.068 |
Sugar v1.14.6+minisat (complete) | 2078936 | SAT | 193.649 | 195.622 |
SAT4J CSP 2.1.1 (complete) | 2078929 | ? | 90.7772 | 89.3818 |
This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).
Solution found:3 0 12 2 4 11 0 19 17 4 25 17 0 25 0 13 8 12 0 19 14 1 19 15 2 0 1 18 15 17 0 19 0 0 18