CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/aim-100/
normalized-aim-100-2-0-sat-1_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/aim-100/
normalized-aim-100-2-0-sat-1_ext.xml
MD5SUMf67ecb4bac030d74a148dda664e43948
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.011997
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints194
Maximum constraint arity3
Maximum domain size2
Number of constraints which are defined in extension194
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2078300SAT 0.011997 0.019173
pcs 0.3.2 (complete)2078292SAT 0.021996 0.0299349
pcs-restart 0.3.2 (complete)2078293SAT 0.023995 0.0321159
SAT4J CSP 2.1.1 (complete)2078291SAT 0.640902 0.673513
Conquer 2009-07-10 (complete)2078299SAT 0.6539 0.83179
Sugar v1.14.6+minisat (complete)2078298SAT 0.686895 0.763584
Sugar v1.14.6+picosat (complete)2078297SAT 0.731888 0.822434
Choco2.1.1 2009-06-10 (complete)2078296SAT 0.734887 0.788372
Choco2.1.1b 2009-07-16 (complete)2116354SAT 0.740886 0.789654
Abscon 112v4 AC (complete)2096885SAT 0.891864 0.940343
Abscon 112v4 ESAC (complete)2096886SAT 0.91186 0.940446
Concrete 2009-07-14 (complete)2078294SAT 0.987848 0.992523
Concrete DC 2009-07-14 (complete)2078295SAT 1.09383 1.14357
bpsolver 09 (complete)2078301SAT 347.315 350.269

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
0 0 0 1 0 1 1 0 0 0 1 1 0 0 1 0 0 0 1 1 1 0 0 1 1 0 0 1 0 1 1 1 0 1 1 0 0 1 0 0 1 1 1 0 0 1 1 1 1 1 1 0 1 0 0 0 0 0 0 1 1 0 1 0 1 1 0 1 0 0
1 1 1 1 1 0 1 0 0 0 1 1 1 0 1 1 0 1 0 1 0 1 0 1 0 1 0 1 1 1