CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/aim-100/
normalized-aim-100-6-0-sat-2_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/aim-100/
normalized-aim-100-6-0-sat-2_ext.xml
MD5SUM3ab669a0c285107bdf20b7a03753675a
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.018996
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints559
Maximum constraint arity3
Maximum domain size2
Number of constraints which are defined in extension559
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2078201SAT 0.018996 0.027029
pcs-restart 0.3.2 (complete)2078194SAT 0.027995 0.035311
pcs 0.3.2 (complete)2078193SAT 0.027995 0.030663
bpsolver 09 (complete)2078202SAT 0.096984 0.104936
Conquer 2009-07-10 (complete)2078200SAT 0.609907 0.791855
Choco2.1.1 2009-06-10 (complete)2078197SAT 0.789879 0.842065
Choco2.1.1b 2009-07-16 (complete)2116345SAT 0.790879 0.843888
Sugar v1.14.6+minisat (complete)2078199SAT 0.852869 0.920907
SAT4J CSP 2.1.1 (complete)2078192SAT 0.944855 0.992233
Sugar v1.14.6+picosat (complete)2078198SAT 1.03084 1.14198
Abscon 112v4 ESAC (complete)2096868SAT 1.04384 1.05941
Concrete 2009-07-14 (complete)2078195SAT 1.07384 1.08985
Abscon 112v4 AC (complete)2096867SAT 1.15882 1.20314
Concrete DC 2009-07-14 (complete)2078196SAT 1.20482 1.22787

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
1 0 1 0 1 1 0 0 0 0 1 1 1 1 1 0 0 1 1 1 1 0 0 1 1 0 1 1 0 1 1 1 0 1 1 1 0 0 0 1 1 1 0 0 0 1 0 0 1 0 1 1 1 1 0 0 1 0 0 0 0 0 0 0 1 0 1 1 0 0
1 1 1 0 1 1 0 0 0 0 0 0 1 0 0 0 1 0 0 1 1 1 0 0 0 1 0 0 0 1