CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-10/
normalized-primes-10-20-2-5.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-10/
normalized-primes-10-20-2-5.xml
MD5SUM3b3ce1be5c5f29602bc15ebf62601308
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.011997
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints20
Maximum constraint arity7
Maximum domain size28
Number of constraints which are defined in extension0
Number of constraints which are defined in intension20
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2078135SAT 0.011997 0.0190581
bpsolver 09 (complete)2078136SAT 0.037993 0.0449889
Choco2.1.1b 2009-07-16 (complete)2116339SAT 0.756884 0.798934
Choco2.1.1 2009-06-10 (complete)2078131SAT 0.858868 0.914615
pcs-restart 0.3.2 (complete)2078128SAT 0.889864 0.898289
pcs 0.3.2 (complete)2078127SAT 1.09783 1.11123
Abscon 112v4 AC (complete)2096855SAT 5.2302 5.32775
Abscon 112v4 ESAC (complete)2096856SAT 10.3784 10.5269
Sugar v1.14.6+minisat (complete)2078133SAT 12.975 13.2505
Sugar v1.14.6+picosat (complete)2078132SAT 49.4655 49.8358
Concrete 2009-07-14 (complete)2078129? (TO) 1800.03 1813.52
Concrete DC 2009-07-14 (complete)2078130? (TO) 1800.04 1803.52
SAT4J CSP 2.1.1 (complete)2078126? (TO) 1802.15 1809.03

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
4 10 2 2 2 18 23 2 28 2 2 2 24 29 10 2 5 15 2 2 12 2 2 2 2 2 2 2 18 8 2 9 2 29 2 2 29 2 2 29 29 2 10 12 26 2 14 2 14 12 16 22 2 2 2 2 23 2
11 2 2 2 8 2 20 2 2 2 2 18 13 2 29 2 3 2 15 2 7 29 2 29 2 2 28 28 6 29 11 24 7 10 27 2 29 13 24 28 2 10