CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-10/
normalized-primes-10-20-3-1.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-10/
normalized-primes-10-20-3-1.xml
MD5SUM8bb7fe2ef1937debeb5806c6e133acee
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.011997
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints20
Maximum constraint arity4
Maximum domain size28
Number of constraints which are defined in extension0
Number of constraints which are defined in intension20
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2078091SAT 0.011997 0.02028
bpsolver 09 (complete)2078092SAT 0.038993 0.0478079
pcs-restart 0.3.2 (complete)2078084SAT 0.511921 0.519024
Choco2.1.1 2009-06-10 (complete)2078087SAT 0.762883 0.812451
Choco2.1.1b 2009-07-16 (complete)2116335SAT 0.777881 0.811479
pcs 0.3.2 (complete)2078083SAT 0.799878 0.811971
Sugar v1.14.6+minisat (complete)2078089SAT 0.875866 0.902872
Sugar v1.14.6+picosat (complete)2078088SAT 1.25381 1.30082
Concrete 2009-07-14 (complete)2078085SAT 1.92171 1.97344
Abscon 112v4 AC (complete)2096847SAT 3.18351 3.23862
Abscon 112v4 ESAC (complete)2096848SAT 3.55946 3.59688
Concrete DC 2009-07-14 (complete)2078086SAT 10.4204 10.5634
SAT4J CSP 2.1.1 (complete)2078082? (TO) 1802.17 1801.64

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
2 23 10 15 2 2 14 3 2 2 2 2 2 3 11 2 2 29 17 4 2 20 4 2 4 8 3 2 2 13 2 22 2 17 2 2 29 2 2 2 2 2 3 6 2 25 2 2 20 2 3 2 13 29 2 13 2 2 2 2 2 4
2 2 2 8 2 29 2 28 2 13 2 18 2 28 28 11 2 24 2 2 29 2 19 2 18 3 2 2 13 2 29 20 2 2 26 2 3 13