CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-10/
normalized-primes-10-20-2-7.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-10/
normalized-primes-10-20-2-7.xml
MD5SUM463851fbfcf9cc61468534a99c1e529b
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.012997
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints20
Maximum constraint arity9
Maximum domain size28
Number of constraints which are defined in extension0
Number of constraints which are defined in intension20
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2078080SAT 0.012997 0.0158739
bpsolver 09 (complete)2078081SAT 0.045992 0.0532991
Choco2.1.1 2009-06-10 (complete)2078076SAT 0.798877 0.844729
Choco2.1.1b 2009-07-16 (complete)2116334SAT 0.881865 0.90536
pcs-restart 0.3.2 (complete)2078073SAT 13.077 13.1441
pcs 0.3.2 (complete)2078072SAT 13.9629 14.0354
Sugar v1.14.6+minisat (complete)2078078SAT 46.8929 47.674
Sugar v1.14.6+picosat (complete)2078077SAT 204.712 206.279
Abscon 112v4 AC (complete)2096845SAT 710.647 717.395
Abscon 112v4 ESAC (complete)2096846SAT 1256.43 1262.27
SAT4J CSP 2.1.1 (complete)2078071? 101.167 99.6682
Concrete DC 2009-07-14 (complete)2078075? (TO) 1800.01 1803.93
Concrete 2009-07-14 (complete)2078074? (TO) 1800.02 1809.02

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
29 2 27 15 22 26 5 7 29 23 4 18 2 3 2 2 2 29 2 27 2 29 2 2 2 2 25 29 15 3 23 2 29 28 29 15 29 29 13 11 3 28 2 28 20 2 10 29 2 2 2 2 2 17 29
3 20 2 2 27 2 6 2 29 8 9 15 3 2 11 2 2 4 29 20 10 2 2 2 29 2 29 29 29 2 28 23 13 4 29 29 2 29 29 8 2 2 2 2 2