CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-10/
normalized-primes-10-20-3-3.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-10/
normalized-primes-10-20-3-3.xml
MD5SUMe7b655904a8656214231c8500c52d2af
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.039993
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints20
Maximum constraint arity6
Maximum domain size28
Number of constraints which are defined in extension0
Number of constraints which are defined in intension20
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2078058SAT 0.039993 0.0486651
bpsolver 09 (complete)2078059SAT 0.040993 0.0491709
Choco2.1.1 2009-06-10 (complete)2078054SAT 0.750885 0.785717
Choco2.1.1b 2009-07-16 (complete)2116332SAT 0.796878 0.813232
pcs 0.3.2 (complete)2078050SAT 0.813875 0.830305
pcs-restart 0.3.2 (complete)2078051SAT 0.867867 0.869951
Sugar v1.14.6+minisat (complete)2078056SAT 4.98824 30.808
Abscon 112v4 AC (complete)2096841SAT 6.11207 6.2053
Abscon 112v4 ESAC (complete)2096842SAT 6.15406 6.21812
Sugar v1.14.6+picosat (complete)2078055SAT 20.7748 20.9452
Concrete 2009-07-14 (complete)2078052SAT 306.06 309.149
SAT4J CSP 2.1.1 (complete)2078049? 191.62 190.69
Concrete DC 2009-07-14 (complete)2078053? (TO) 1800.06 1806.22

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
2 2 20 11 4 2 2 8 2 29 2 2 2 18 2 2 2 29 2 24 9 2 2 2 2 2 7 17 29 9 29 5 2 23 2 2 20 8 2 4 29 2 2 2 2 2 20 2 6 29 2 29 2 25 2 23 2 2 2 18 29
8 2 2 20 29 2 29 7 29 9 4 29 2 2 24 2 15 2 11 18 2 11 21 2 2 2 2 13 2 2 2 23 8 2 20 2 2 2 21