CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-15/
normalized-primes-15-60-3-7.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-15/
normalized-primes-15-60-3-7.xml
MD5SUM54f0d4d11a26de12f0658f94aa809aa9
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmark
Best CPU time to get the best result obtained on this benchmark
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints60
Maximum constraint arity10
Maximum domain size46
Number of constraints which are defined in extension0
Number of constraints which are defined in intension60
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
SAT4J CSP 2.1.1 (complete)2077884? 169.853 169.921
Sugar v1.14.6+picosat (complete)2077890? 258.618 269.293
Sugar v1.14.6+minisat (complete)2077891? 260.404 272.11
Concrete DC 2009-07-14 (complete)2077888? (TO) 1800.06 1815.62
bpsolver 09 (complete)2077894? (TO) 1800.06 1807.91
Concrete 2009-07-14 (complete)2077887? (TO) 1800.08 1814.02
Mistral 1.545 (complete)2077893? (TO) 1800.1 1812.31
Abscon 112v4 AC (complete)2096811? (TO) 1800.11 1812.54
pcs-restart 0.3.2 (complete)2077886? (TO) 1800.12 1811.41
Choco2.1.1 2009-06-10 (complete)2077889? (TO) 1800.14 1801.08
Choco2.1.1b 2009-07-16 (complete)2116317? (TO) 1800.16 1814.07
Abscon 112v4 ESAC (complete)2096812? (TO) 1800.17 1813.36
pcs 0.3.2 (complete)2077885? (TO) 1800.19 1804.02

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: