CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-15/
normalized-primes-15-20-3-7.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-15/
normalized-primes-15-20-3-7.xml
MD5SUM5a9755a4ca72128afdbeb99b36b30378
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.044992
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints20
Maximum constraint arity10
Maximum domain size46
Number of constraints which are defined in extension0
Number of constraints which are defined in intension20
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
bpsolver 09 (complete)2077872SAT 0.044992 0.0539159
Mistral 1.545 (complete)2077871SAT 0.06199 0.0694279
Choco2.1.1b 2009-07-16 (complete)2116315SAT 0.930858 0.952601
Choco2.1.1 2009-06-10 (complete)2077867SAT 1.13183 1.17454
Sugar v1.14.6+picosat (complete)2077868? 266.416 279.143
Sugar v1.14.6+minisat (complete)2077869? 278.291 291.378
SAT4J CSP 2.1.1 (complete)2077862? 600.705 599.838
Concrete 2009-07-14 (complete)2077865? (TO) 1800.05 1803.82
pcs-restart 0.3.2 (complete)2077864? (TO) 1800.06 1813.63
Concrete DC 2009-07-14 (complete)2077866? (TO) 1800.07 1802.52
pcs 0.3.2 (complete)2077863? (TO) 1800.08 1810.93
Abscon 112v4 ESAC (complete)2096808? (TO) 1800.1 1807.03
Abscon 112v4 AC (complete)2096807? (TO) 1800.14 1808.06

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
2 9 2 2 2 44 46 5 47 2 46 2 44 26 2 2 2 2 4 2 47 31 47 2 40 47 2 43 41 26 2 2 41 32 22 28 32 2 3 16 2 7 2 9 5 2 2 2 3 46 3 2 10 41 7 11 41
14 39 20 2 2 2 2 2 2 2 47 20 2 47 2 2 2 47 2 34 23 2 2 2 2 3 2 40 2 8 19 45 2 22 40 8 2 38 2 2 2 2 47