CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-15/
normalized-primes-15-40-2-7.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-15/
normalized-primes-15-40-2-7.xml
MD5SUMdd73b653e941c848140715c0efeb13bc
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark62.8854
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints40
Maximum constraint arity9
Maximum domain size46
Number of constraints which are defined in extension0
Number of constraints which are defined in intension40
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Choco2.1.1 2009-06-10 (complete)2077856SAT 62.8854 63.6086
Choco2.1.1b 2009-07-16 (complete)2116314SAT 359.615 359.784
Mistral 1.545 (complete)2077860SAT 589.696 591.541
SAT4J CSP 2.1.1 (complete)2077851? 173.079 172.622
Sugar v1.14.6+picosat (complete)2077857? 206.53 214.865
Sugar v1.14.6+minisat (complete)2077858? 308.516 766.603
Concrete DC 2009-07-14 (complete)2077855? (TO) 1800.03 1805.82
bpsolver 09 (complete)2077861? (TO) 1800.07 1806.71
Concrete 2009-07-14 (complete)2077854? (TO) 1800.1 1812.72
Abscon 112v4 AC (complete)2096805? (TO) 1800.13 1812.17
pcs 0.3.2 (complete)2077852? (TO) 1800.14 1808.8
Abscon 112v4 ESAC (complete)2096806? (TO) 1800.17 1801.86
pcs-restart 0.3.2 (complete)2077853? (TO) 1800.18 1812.29

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
22 22 42 22 23 31 33 8 42 3 7 30 21 10 46 5 16 17 8 3 42 14 3 27 10 25 3 35 20 38 45 3 24 17 42 45 43 3 14 19 29 6 33 42 45 25 21 44 13 2 23
2 14 4 11 5 18 9 45 3 32 2 43 39 37 27 7 26 42 5 41 2 44 21 23 35 44 13 28 17 5 26 20 23 10 29 7 46 44 9 36 26 37 31 11 4 44 20 29 47