CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-15/
normalized-primes-15-20-2-7.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-15/
normalized-primes-15-20-2-7.xml
MD5SUMe2e5b8738391b6588798536d183cefce
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.012997
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints20
Maximum constraint arity9
Maximum domain size46
Number of constraints which are defined in extension0
Number of constraints which are defined in intension20
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2077816SAT 0.012997 0.016589
bpsolver 09 (complete)2077817SAT 0.046991 0.0534629
Choco2.1.1b 2009-07-16 (complete)2116310SAT 0.862868 0.893461
Choco2.1.1 2009-06-10 (complete)2077812SAT 0.964852 1.01664
pcs 0.3.2 (complete)2077808SAT 14.2928 14.4343
pcs-restart 0.3.2 (complete)2077809SAT 121.24 122.354
SAT4J CSP 2.1.1 (complete)2077807? 171.576 170.365
Sugar v1.14.6+minisat (complete)2077814? (MO) 161.103 180.71
Sugar v1.14.6+picosat (complete)2077813? (MO) 369.181 378.297
Concrete 2009-07-14 (complete)2077810? (TO) 1800.03 1800.73
Concrete DC 2009-07-14 (complete)2077811? (TO) 1800.04 1804.03
Abscon 112v4 AC (complete)2096797? (TO) 1800.09 1812.17
Abscon 112v4 ESAC (complete)2096798? (TO) 1800.18 1814.77

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
6 2 20 38 23 21 21 47 2 20 4 47 13 2 2 2 2 39 2 46 46 37 2 32 2 46 2 47 47 42 47 2 43 2 45 3 47 2 24 10 3 47 2 44 47 2 14 47 45 2 30 2 2 10
44 2 9 2 2 44 4 2 2 27 41 22 30 4 2 10 2 2 45 47 23 2 2 2 2 44 2 46 38 47 2 25 47 47 35 2 11 3 8 2 19 2 2 38 2 47