CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-15/
normalized-primes-15-20-3-3.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-15/
normalized-primes-15-20-3-3.xml
MD5SUM2c0f685b6dffd0b21e9d6ad0f83ab81d
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.011997
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints20
Maximum constraint arity6
Maximum domain size46
Number of constraints which are defined in extension0
Number of constraints which are defined in intension20
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2077761SAT 0.011997 0.0192021
bpsolver 09 (complete)2077762SAT 0.039993 0.0493689
Choco2.1.1 2009-06-10 (complete)2077757SAT 0.786879 0.85549
Choco2.1.1b 2009-07-16 (complete)2116305SAT 0.821874 0.857284
pcs-restart 0.3.2 (complete)2077754SAT 10.6234 10.7284
pcs 0.3.2 (complete)2077753SAT 11.1703 11.2801
Sugar v1.14.6+picosat (complete)2077758SAT 224.951 250.131
Abscon 112v4 ESAC (complete)2096788SAT 1145.16 1150.32
Abscon 112v4 AC (complete)2096787SAT 1146.23 1153.67
SAT4J CSP 2.1.1 (complete)2077752? 154.781 153.934
Sugar v1.14.6+minisat (complete)2077759? (MO) 49.4585 52.0567
Concrete DC 2009-07-14 (complete)2077756? (TO) 1800.01 1809.62
Concrete 2009-07-14 (complete)2077755? (TO) 1800.02 1807.92

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
2 2 41 39 42 2 2 23 2 34 2 2 12 47 2 47 2 6 2 6 25 2 2 2 2 11 7 12 19 31 47 11 2 21 2 2 43 37 2 13 28 2 2 2 3 2 40 2 32 2 23 2 2 9 2 33 8 2
2 3 47 7 2 2 26 2 2 47 47 2 46 2 46 2 15 33 46 47 2 30 2 2 2 23 13 2 2 2 47 2 47 2 42 47 2 26 2 2 2 47