CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/wordsHerald/
normalized-crossword-m1-words-05-02.xml

Jump to solvers results

General information on the benchmark

Namecsp/wordsHerald/
normalized-crossword-m1-words-05-02.xml
MD5SUM3d7c8d13309560a455bfd2cf0a6d5be0
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.048991
Satisfiable
(Un)Satisfiability was proved
Number of variables23
Number of constraints31
Maximum constraint arity10
Maximum domain size26
Number of constraints which are defined in extension10
Number of constraints which are defined in intension21
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2077684SAT 0.048991 0.0511679
pcs 0.3.2 (complete)2077676SAT 0.290954 0.299043
pcs-restart 0.3.2 (complete)2077677SAT 0.301954 0.306865
bpsolver 09 (complete)2077685SAT 0.476927 0.5365
Abscon 112v4 AC (complete)2096773SAT 0.98085 1.00531
Abscon 112v4 ESAC (complete)2096774SAT 0.98085 1.00623
Choco2.1.1 2009-06-10 (complete)2077680SAT 1.47078 1.53142
Choco2.1.1b 2009-07-16 (complete)2116298SAT 1.79972 1.85037
Sugar v1.14.6+minisat (complete)2077682SAT 6.15506 6.74101
Sugar v1.14.6+picosat (complete)2077681SAT 7.92879 8.75653
Concrete 2009-07-14 (complete)2077678SAT 54.9256 55.5536
Concrete DC 2009-07-14 (complete)2077679SAT 65.92 66.6123
SAT4J CSP 2.1.1 (complete)2077675? 105.364 110.025

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
18 2 0 17 22 0 17 4 18 0 1 0 1 0 1 0 1 4 11 11 24 11 4