CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/lexPuzzle/
normalized-crossword-m1-lex-puzzle03.xml

Jump to solvers results

General information on the benchmark

Namecsp/lexPuzzle/
normalized-crossword-m1-lex-puzzle03.xml
MD5SUM273eaa99825c43076cf632d267d87c6d
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.018996
Satisfiable
(Un)Satisfiability was proved
Number of variables14
Number of constraints20
Maximum constraint arity8
Maximum domain size26
Number of constraints which are defined in extension8
Number of constraints which are defined in intension12
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2076353SAT 0.018996 0.0277049
pcs-restart 0.3.2 (complete)2076346SAT 0.034994 0.042302
pcs 0.3.2 (complete)2076345SAT 0.042993 0.049378
bpsolver 09 (complete)2076354SAT 0.167974 0.174707
Abscon 112v4 ESAC (complete)2096532SAT 0.78788 0.840569
Abscon 112v4 AC (complete)2096531SAT 0.794878 0.835832
Choco2.1.1b 2009-07-16 (complete)2116177SAT 0.995847 1.04752
Choco2.1.1 2009-06-10 (complete)2076349SAT 1.01984 1.0518
Sugar v1.14.6+minisat (complete)2076351SAT 1.3028 1.6648
Sugar v1.14.6+picosat (complete)2076350SAT 1.56776 1.90091
Concrete 2009-07-14 (complete)2076347SAT 51.8521 52.4038
Concrete DC 2009-07-14 (complete)2076348SAT 59.5209 60.1075
SAT4J CSP 2.1.1 (complete)2076344? (TO) 1800.18 1808.22

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
18 18 19 18 20 17 4 22 4 8 17 25 14 4