CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/lexPuzzle/
normalized-crossword-m1-lex-puzzle09.xml

Jump to solvers results

General information on the benchmark

Namecsp/lexPuzzle/
normalized-crossword-m1-lex-puzzle09.xml
MD5SUMd9fbe1b8b0983e4e711af0b81931d16b
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.067989
Satisfiable
(Un)Satisfiability was proved
Number of variables35
Number of constraints55
Maximum constraint arity14
Maximum domain size26
Number of constraints which are defined in extension17
Number of constraints which are defined in intension38
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2076320SAT 0.067989 0.070221
pcs 0.3.2 (complete)2076312SAT 0.175973 0.182383
pcs-restart 0.3.2 (complete)2076313SAT 0.372943 0.379806
bpsolver 09 (complete)2076321SAT 0.605907 0.619044
Abscon 112v4 AC (complete)2096525SAT 0.954854 0.991967
Abscon 112v4 ESAC (complete)2096526SAT 0.997847 1.05785
Choco2.1.1b 2009-07-16 (complete)2116174SAT 2.18967 2.27139
Choco2.1.1 2009-06-10 (complete)2076316SAT 2.6166 2.6807
Sugar v1.14.6+minisat (complete)2076318SAT 16.1525 17.1245
Sugar v1.14.6+picosat (complete)2076317SAT 19.931 20.2098
Concrete 2009-07-14 (complete)2076314SAT 59.7159 60.3399
Concrete DC 2009-07-14 (complete)2076315SAT 77.07 78.1081
SAT4J CSP 2.1.1 (complete)2076311? 91.3571 90.4925

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
15 20 13 3 0 10 0 17 19 8 11 1 14 0 8 17 0 13 8 0 13 15 0 25 18 2 8 2 25 4 2 7 8 19 14