CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/rand-8-20-5/
normalized-rand-8-20-5-18-800-8_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/rand-8-20-5/
normalized-rand-8-20-5-18-800-8_ext.xml
MD5SUM15c3c041a0681c25c1693041f0df8ce7
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark24.9112
Satisfiable
(Un)Satisfiability was proved
Number of variables20
Number of constraints18
Maximum constraint arity8
Maximum domain size5
Number of constraints which are defined in extension18
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2074978SAT 24.9112 25.1473
Choco2.1.1 2009-06-10 (complete)2074974SAT 27.2019 27.3986
Choco2.1.1b 2009-07-16 (complete)2116052SAT 29.0506 29.3646
Conquer 2009-07-10 (complete)2074977SAT 151.929 153.649
Abscon 112v4 AC (complete)2096281SAT 245.917 246.812
Abscon 112v4 ESAC (complete)2096282SAT 389.049 390.97
SAT4J CSP 2.1.1 (complete)2074969? 93.2418 92.4434
bpsolver 09 (complete)2074979? (problem) 117.255 117.599
Sugar v1.14.6+picosat (complete)2074975? (MO) 12.916 13.5619
Sugar v1.14.6+minisat (complete)2074976? (MO) 14.65 14.9096
Concrete DC 2009-07-14 (complete)2074973? (TO) 1800 1809.43
Concrete 2009-07-14 (complete)2074972? (TO) 1800.02 1815.02
pcs-restart 0.3.2 (complete)2074971? (TO) 1800.1 1815.03
pcs 0.3.2 (complete)2074970? (TO) 1800.1 1801.32

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
0 4 1 4 2 3 1 3 3 1 1 3 1 2 4 4 2 1 3 2