CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/rand-8-20-5/
normalized-rand-8-20-5-18-800-14_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/rand-8-20-5/
normalized-rand-8-20-5-18-800-14_ext.xml
MD5SUM0b43ac9df0b5dd736b9f382993324f9e
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark5.07923
Satisfiable
(Un)Satisfiability was proved
Number of variables20
Number of constraints18
Maximum constraint arity8
Maximum domain size5
Number of constraints which are defined in extension18
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2074934SAT 5.07923 5.08624
Choco2.1.1b 2009-07-16 (complete)2116048SAT 56.2414 56.8296
Conquer 2009-07-10 (complete)2074933SAT 113.329 113.906
Choco2.1.1 2009-06-10 (complete)2074930SAT 235.157 236.405
Abscon 112v4 ESAC (complete)2096274SAT 249.958 252.415
Abscon 112v4 AC (complete)2096273SAT 253.994 257.112
pcs-restart 0.3.2 (complete)2074927SAT 1557.82 1560.46
SAT4J CSP 2.1.1 (complete)2074925? 84.0752 84.077
bpsolver 09 (complete)2074935? (problem) 124.737 125.885
Sugar v1.14.6+minisat (complete)2074932? (MO) 12.86 13.6131
Sugar v1.14.6+picosat (complete)2074931? (MO) 12.896 14.7817
Concrete DC 2009-07-14 (complete)2074929? (TO) 1800.02 1806.52
Concrete 2009-07-14 (complete)2074928? (TO) 1800.03 1815.72
pcs 0.3.2 (complete)2074926? (TO) 1800.11 1803.22

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
4 4 1 2 0 2 3 0 4 1 2 1 0 4 3 1 4 2 0 0