CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/wordsPuzzle/
normalized-crossword-m1-words-puzzle01.xml

Jump to solvers results

General information on the benchmark

Namecsp/wordsPuzzle/
normalized-crossword-m1-words-puzzle01.xml
MD5SUM105535cb9049659ac27a5c350854c97c
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.005998
Satisfiable
(Un)Satisfiability was proved
Number of variables3
Number of constraints3
Maximum constraint arity2
Maximum domain size26
Number of constraints which are defined in extension2
Number of constraints which are defined in intension1
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2074780SAT 0.005998 0.0133031
pcs 0.3.2 (complete)2074772SAT 0.015997 0.019118
pcs-restart 0.3.2 (complete)2074773SAT 0.016997 0.01646
bpsolver 09 (complete)2074781SAT 0.023996 0.0313901
Choco2.1.1b 2009-07-16 (complete)2116034SAT 0.472927 0.487021
Sugar v1.14.6+minisat (complete)2074778SAT 0.491924 0.555653
Choco2.1.1 2009-06-10 (complete)2074776SAT 0.493924 0.529152
Sugar v1.14.6+picosat (complete)2074777SAT 0.503923 0.564429
Abscon 112v4 AC (complete)2096245SAT 0.643901 0.678128
Abscon 112v4 ESAC (complete)2096246SAT 0.663898 0.685273
SAT4J CSP 2.1.1 (complete)2074771SAT 0.748885 0.785911
Concrete 2009-07-14 (complete)2074774SAT 0.962852 0.989964
Concrete DC 2009-07-14 (complete)2074775SAT 1.06284 1.12017

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
7 0 23