CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/
chessboardColoration/normalized-cc-6-6-2.xml

Jump to solvers results

General information on the benchmark

Namecsp/
chessboardColoration/normalized-cc-6-6-2.xml
MD5SUM6d331089ced3fa3643a4429b2fd23353
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.18897
Satisfiable
(Un)Satisfiability was proved
Number of variables36
Number of constraints225
Maximum constraint arity4
Maximum domain size2
Number of constraints which are defined in extension0
Number of constraints which are defined in intension225
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
bpsolver 09 (complete)2074396UNSAT 0.18897 0.190038
Mistral 1.545 (complete)2074395UNSAT 0.429934 0.436983
Abscon 112v4 ESAC (complete)2096176UNSAT 1.05684 1.09637
Abscon 112v4 AC (complete)2096175UNSAT 1.14282 1.2064
Sugar v1.14.6+minisat (complete)2074393UNSAT 1.21081 1.29118
Sugar v1.14.6+picosat (complete)2074392UNSAT 1.37579 1.48395
SAT4J CSP 2.1.1 (complete)2074386UNSAT 2.13268 2.19959
Concrete 2009-07-14 (complete)2074389UNSAT 2.80857 2.85727
Concrete DC 2009-07-14 (complete)2074390UNSAT 2.85656 2.91461
Choco2.1.1 2009-06-10 (complete)2074391UNSAT 3.38848 3.4595
Choco2.1.1b 2009-07-16 (complete)2115999UNSAT 3.52046 3.5507
pcs-restart 0.3.2 (complete)2074388UNSAT 15.7316 15.8741
pcs 0.3.2 (complete)2074387UNSAT 15.9136 16.0707

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: