CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/os-taillard-5/
normalized-os-taillard-5-95-2.xml

Jump to solvers results

General information on the benchmark

Namecsp/os-taillard-5/
normalized-os-taillard-5-95-2.xml
MD5SUMa5e7d4c0009de4f12970d8c5803b6140
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.014997
Satisfiable
(Un)Satisfiability was proved
Number of variables25
Number of constraints100
Maximum constraint arity2
Maximum domain size305
Number of constraints which are defined in extension0
Number of constraints which are defined in intension100
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2074120UNSAT 0.014997 0.0172011
bpsolver 09 (complete)2074121UNSAT 0.044992 0.0517001
pcs-restart 0.3.2 (complete)2074113UNSAT 0.234964 0.241682
pcs 0.3.2 (complete)2074112UNSAT 0.688895 0.699785
Choco2.1.1 2009-06-10 (complete)2074116UNSAT 0.706891 0.733651
Sugar v1.14.6+minisat (complete)2074118UNSAT 0.777881 0.785658
Choco2.1.1b 2009-07-16 (complete)2115974UNSAT 0.799878 0.8582
Sugar v1.14.6+picosat (complete)2074117UNSAT 1.18482 1.26949
Concrete 2009-07-14 (complete)2074114UNSAT 13.45 13.5966
SAT4J CSP 2.1.1 (complete)2074111UNSAT 32.658 33.1126
Concrete DC 2009-07-14 (complete)2074115UNSAT 39.388 39.4475
Abscon 112v4 AC (complete)2096125UNSAT 315.317 315.481
Abscon 112v4 ESAC (complete)2096126UNSAT 316.867 318.621

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: