CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/os-taillard-5/
normalized-os-taillard-5-95-8.xml

Jump to solvers results

General information on the benchmark

Namecsp/os-taillard-5/
normalized-os-taillard-5-95-8.xml
MD5SUMec69a18ba15b065d64b927e35a64648c
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.015997
Satisfiable
(Un)Satisfiability was proved
Number of variables25
Number of constraints100
Maximum constraint arity2
Maximum domain size320
Number of constraints which are defined in extension0
Number of constraints which are defined in intension100
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2074065UNSAT 0.015997 0.023285
bpsolver 09 (complete)2074066UNSAT 0.050991 0.055489
pcs-restart 0.3.2 (complete)2074058UNSAT 0.543917 0.549855
Choco2.1.1 2009-06-10 (complete)2074061UNSAT 0.693893 0.779612
Choco2.1.1b 2009-07-16 (complete)2115969UNSAT 0.703892 0.730299
pcs 0.3.2 (complete)2074057UNSAT 0.737887 0.745384
Sugar v1.14.6+minisat (complete)2074063UNSAT 0.819874 0.97506
Sugar v1.14.6+picosat (complete)2074062UNSAT 1.27681 1.39397
Concrete 2009-07-14 (complete)2074059UNSAT 4.90425 4.98888
Abscon 112v4 AC (complete)2096115UNSAT 11.2363 11.3654
Abscon 112v4 ESAC (complete)2096116UNSAT 11.3923 11.5099
SAT4J CSP 2.1.1 (complete)2074056UNSAT 65.3661 63.6471
Concrete DC 2009-07-14 (complete)2074060UNSAT 118.017 118.976

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: