CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/aim-50/
normalized-aim-50-6-0-sat-3_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/aim-50/
normalized-aim-50-6-0-sat-3_ext.xml
MD5SUM1222a6082410e00ae5ca7726a5dee972
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.011997
Satisfiable
(Un)Satisfiability was proved
Number of variables50
Number of constraints268
Maximum constraint arity3
Maximum domain size2
Number of constraints which are defined in extension268
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2074010SAT 0.011997 0.0210151
pcs 0.3.2 (complete)2074002SAT 0.021996 0.02858
pcs-restart 0.3.2 (complete)2074003SAT 0.022995 0.0526501
bpsolver 09 (complete)2074011SAT 0.06199 0.0680851
Conquer 2009-07-10 (complete)2074009SAT 0.560914 0.738679
Choco2.1.1b 2009-07-16 (complete)2115964SAT 0.608907 0.633401
SAT4J CSP 2.1.1 (complete)2074001SAT 0.674896 0.514732
Choco2.1.1 2009-06-10 (complete)2074006SAT 0.675896 0.704759
Sugar v1.14.6+picosat (complete)2074007SAT 0.708891 0.626649
Sugar v1.14.6+minisat (complete)2074008SAT 0.71189 0.666643
Abscon 112v4 ESAC (complete)2096106SAT 0.785879 0.783734
Abscon 112v4 AC (complete)2096105SAT 0.812875 0.845233
Concrete 2009-07-14 (complete)2074004SAT 0.998847 1.02089
Concrete DC 2009-07-14 (complete)2074005SAT 1.03584 1.07135

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
0 0 1 1 0 1 1 1 1 0 1 1 1 0 1 1 1 0 0 1 0 0 0 0 1 0 1 0 1 0 1 0 0 1 0 1 0 1 1 0 0 1 1 1 0 1 0 1 1 1