CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/aim-50/
normalized-aim-50-6-0-sat-2_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/aim-50/
normalized-aim-50-6-0-sat-2_ext.xml
MD5SUM4aa7e33adc468a879a2cbe91836afef3
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.011997
Satisfiable
(Un)Satisfiability was proved
Number of variables50
Number of constraints284
Maximum constraint arity3
Maximum domain size2
Number of constraints which are defined in extension284
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2073988SAT 0.011997 0.0180069
pcs-restart 0.3.2 (complete)2073981SAT 0.021996 0.028713
pcs 0.3.2 (complete)2073980SAT 0.021996 0.029269
bpsolver 09 (complete)2073989SAT 0.05799 0.0657251
Conquer 2009-07-10 (complete)2073987SAT 0.565913 0.76832
Choco2.1.1 2009-06-10 (complete)2073984SAT 0.592909 0.64356
Choco2.1.1b 2009-07-16 (complete)2115962SAT 0.622905 0.676766
SAT4J CSP 2.1.1 (complete)2073979SAT 0.686895 0.744225
Sugar v1.14.6+picosat (complete)2073985SAT 0.707891 0.82856
Sugar v1.14.6+minisat (complete)2073986SAT 0.725889 0.85943
Abscon 112v4 ESAC (complete)2096102SAT 0.841871 0.893607
Abscon 112v4 AC (complete)2096101SAT 0.841871 0.835974
Concrete 2009-07-14 (complete)2073982SAT 1.02384 1.05036
Concrete DC 2009-07-14 (complete)2073983SAT 1.08283 1.09792

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
0 0 1 0 1 1 0 1 0 0 0 0 1 0 0 0 0 1 0 0 1 1 0 0 1 1 0 1 0 0 0 1 1 1 1 0 1 1 0 1 0 1 0 0 1 0 1 0 0 1