CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/aim-50/
normalized-aim-50-2-0-unsat-4_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/aim-50/
normalized-aim-50-2-0-unsat-4_ext.xml
MD5SUM85868a31bd612ab2f394dc19e19041db
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.006998
Satisfiable
(Un)Satisfiability was proved
Number of variables50
Number of constraints95
Maximum constraint arity3
Maximum domain size2
Number of constraints which are defined in extension95
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2073856UNSAT 0.006998 0.0129499
pcs-restart 0.3.2 (complete)2073849UNSAT 0.016997 0.020812
pcs 0.3.2 (complete)2073848UNSAT 0.020995 0.02583
bpsolver 09 (complete)2073857UNSAT 0.229964 0.236238
Choco2.1.1 2009-06-10 (complete)2073852UNSAT 0.489925 0.471293
Choco2.1.1b 2009-07-16 (complete)2115950UNSAT 0.505922 0.520377
Conquer 2009-07-10 (complete)2073855UNSAT 0.553915 0.739319
SAT4J CSP 2.1.1 (complete)2073847UNSAT 0.570913 0.642484
Sugar v1.14.6+picosat (complete)2073853UNSAT 0.618905 0.777111
Sugar v1.14.6+minisat (complete)2073854UNSAT 0.619905 0.723432
Abscon 112v4 AC (complete)2096077UNSAT 0.813876 0.849287
Abscon 112v4 ESAC (complete)2096078UNSAT 0.830873 0.851635
Concrete DC 2009-07-14 (complete)2073851UNSAT 0.974851 1.02683
Concrete 2009-07-14 (complete)2073850UNSAT 0.981849 1.03869

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: