CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/aim-50/
normalized-aim-50-2-0-unsat-3_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/aim-50/
normalized-aim-50-2-0-unsat-3_ext.xml
MD5SUM885c685aa8d56ae4fd1d7762ba1df2f8
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.009998
Satisfiable
(Un)Satisfiability was proved
Number of variables50
Number of constraints92
Maximum constraint arity3
Maximum domain size2
Number of constraints which are defined in extension92
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2073845UNSAT 0.009998 0.011024
pcs-restart 0.3.2 (complete)2073838UNSAT 0.017996 0.025544
pcs 0.3.2 (complete)2073837UNSAT 0.018996 0.026095
bpsolver 09 (complete)2073846UNSAT 0.068988 0.068763
Choco2.1.1b 2009-07-16 (complete)2115949UNSAT 0.553915 0.572719
Conquer 2009-07-10 (complete)2073844UNSAT 0.555914 0.743014
SAT4J CSP 2.1.1 (complete)2073836UNSAT 0.565913 0.628464
Sugar v1.14.6+minisat (complete)2073843UNSAT 0.596908 0.668737
Choco2.1.1 2009-06-10 (complete)2073841UNSAT 0.600908 0.647617
Sugar v1.14.6+picosat (complete)2073842UNSAT 0.615906 0.693504
Abscon 112v4 AC (complete)2096075UNSAT 0.852869 0.896395
Abscon 112v4 ESAC (complete)2096076UNSAT 0.861868 0.884225
Concrete 2009-07-14 (complete)2073839UNSAT 0.958854 1.01456
Concrete DC 2009-07-14 (complete)2073840UNSAT 0.986849 1.03751

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: