CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/aim-50/
normalized-aim-50-1-6-sat-4_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/aim-50/
normalized-aim-50-1-6-sat-4_ext.xml
MD5SUM98cc1ac7109a27c7b5eb44d5bffb3238
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.007998
Satisfiable
(Un)Satisfiability was proved
Number of variables50
Number of constraints77
Maximum constraint arity3
Maximum domain size2
Number of constraints which are defined in extension77
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2073812SAT 0.007998 0.015763
pcs-restart 0.3.2 (complete)2073805SAT 0.017996 0.0255361
pcs 0.3.2 (complete)2073804SAT 0.018996 0.025395
bpsolver 09 (complete)2073813SAT 0.038993 0.04648
Choco2.1.1b 2009-07-16 (complete)2115946SAT 0.507922 0.522759
Choco2.1.1 2009-06-10 (complete)2073808SAT 0.546916 0.59966
Conquer 2009-07-10 (complete)2073811SAT 0.549916 0.737982
Sugar v1.14.6+picosat (complete)2073809SAT 0.569912 0.664473
SAT4J CSP 2.1.1 (complete)2073803SAT 0.591909 0.627658
Sugar v1.14.6+minisat (complete)2073810SAT 0.591909 0.64116
Abscon 112v4 ESAC (complete)2096070SAT 0.736887 0.795688
Abscon 112v4 AC (complete)2096069SAT 0.806876 0.84981
Concrete 2009-07-14 (complete)2073806SAT 0.950855 0.988847
Concrete DC 2009-07-14 (complete)2073807SAT 0.966852 0.984028

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
0 1 0 0 0 1 0 0 0 1 1 0 0 1 1 1 0 1 1 1 0 1 1 1 1 0 0 0 0 0 0 1 0 0 1 1 0 0 1 1 0 1 1 1 0 1 1 0 0 1