CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/pseudoGLB/
normalized-reduced-prob6.xml

Jump to solvers results

General information on the benchmark

Namecsp/pseudoGLB/
normalized-reduced-prob6.xml
MD5SUM0fd987bbf03d8ee2b42b4c174fc0fcac
Bench CategoryAlldiff+Elt+WSum (alldiff,element,weightedsum)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.011997
Satisfiable
(Un)Satisfiability was proved
Number of variables93
Number of constraints2
Maximum constraint arity93
Maximum domain size2
Number of constraints which are defined in extension0
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)weightedsum(2)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2073053SAT 0.011997 0.0184311
bpsolver 09 (complete)2073054SAT 0.035994 0.0432329
Choco2.1.1 2009-06-10 (complete)2073049SAT 0.489925 0.520226
Choco2.1.1b 2009-07-16 (complete)2115877SAT 0.512921 0.519801
Sugar v1.14.6+minisat (complete)2073051? 971.827 1040.61
Sugar v1.14.6+picosat (complete)2073050? 997.527 1043.7
Abscon 112v4 AC (complete)2095931? (TO) 1800.09 1811.36
Abscon 112v4 ESAC (complete)2095932? (TO) 1800.15 1801.46

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
0 0 0 1 1 0 0 0 0 0 0 0 1 1 0 1 1 0 0 0 0 1 0 1 1 1 0 1 0 0 0 0 0 1 1 0 0 1 0 0 0 0 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0