CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/ukVg/
normalized-crossword-m1c-uk-vg14-16_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/ukVg/
normalized-crossword-m1c-uk-vg14-16_ext.xml
MD5SUM71ac09d37f4ac1064a6a1973aa3d8c5c
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark14.5918
Satisfiable
(Un)Satisfiability was proved
Number of variables224
Number of constraints30
Maximum constraint arity16
Maximum domain size26
Number of constraints which are defined in extension30
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Abscon 112v4 AC (complete)2095689UNSAT 14.5918 14.7826
Abscon 112v4 ESAC (complete)2095690UNSAT 19.576 19.8298
Mistral 1.545 (complete)2071722UNSAT 24.1743 24.1889
Conquer 2009-07-10 (complete)2071721UNSAT 41.0318 41.6324
Concrete 2009-07-14 (complete)2071716UNSAT 73.8778 74.1966
Choco2.1.1b 2009-07-16 (complete)2115756UNSAT 103.879 103.928
Choco2.1.1 2009-06-10 (complete)2071718UNSAT 116.875 117.977
pcs-restart 0.3.2 (complete)2071715UNSAT 218.955 220.06
pcs 0.3.2 (complete)2071714UNSAT 221.861 223.33
bpsolver 09 (complete)2071723UNSAT 596.302 597.805
SAT4J CSP 2.1.1 (complete)2071713? 77.5902 76.729
Sugar v1.14.6+picosat (complete)2071719? (TO) 1800.03 1803.06
Concrete DC 2009-07-14 (complete)2071717? (TO) 1800.07 1802.32
Sugar v1.14.6+minisat (complete)2071720? (TO) 1800.21 1811.21

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: