CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/travellingSalesman-25/
normalized-tsp-25-523_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/travellingSalesman-25/
normalized-tsp-25-523_ext.xml
MD5SUMa3c9be0c891d85f7c4694b452ebfd1e1
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark39.9089
Satisfiable
(Un)Satisfiability was proved
Number of variables76
Number of constraints350
Maximum constraint arity3
Maximum domain size1001
Number of constraints which are defined in extension350
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Concrete 2009-07-14 (complete)2071397SAT 39.9089 40.3212
Mistral 1.545 (complete)2071403SAT 42.4186 42.4403
Abscon 112v4 AC (complete)2095631SAT 44.8492 45.305
Choco2.1.1b 2009-07-16 (complete)2115727SAT 97.3562 97.4058
Abscon 112v4 ESAC (complete)2095632SAT 114.491 115.639
Conquer 2009-07-10 (complete)2071402SAT 118.17 118.958
bpsolver 09 (complete)2071404SAT 136.964 138.203
Choco2.1.1 2009-06-10 (complete)2071399SAT 809.003 809.963
Sugar v1.14.6+picosat (complete)2071400SAT 894.903 901.68
Concrete DC 2009-07-14 (complete)2071398SAT 937.808 940.83
Sugar v1.14.6+minisat (complete)2071401SAT 1735.42 1753.85
pcs 0.3.2 (complete)2071395? (TO) 1800.09 1807.71
pcs-restart 0.3.2 (complete)2071396? (TO) 1800.12 1808.71
SAT4J CSP 2.1.1 (complete)2071394? (TO) 1802.14 1812.42

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
15 17 13 10 18 3 14 0 3 0 16 6 17 4 19 4 20 1 6 0 22 15 23 2 25 4 24 24 5 1 4 2 9 7 12 15 10 11 8 11 11 1 2 0 7 17 21 12 1 8 27 30 30 30 36
40 44 45 45 60 62 66 90 91 93 100 115 126 137 138 138 155 167 175 175 0