CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-20/
normalized-primes-20-20-2-5.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-20/
normalized-primes-20-20-2-5.xml
MD5SUM50755e5b035cf852450edd54742fdcb2
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.021996
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints20
Maximum constraint arity7
Maximum domain size70
Number of constraints which are defined in extension0
Number of constraints which are defined in intension20
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2070864SAT 0.021996 0.0308339
bpsolver 09 (complete)2070865SAT 0.040992 0.050651
Choco2.1.1b 2009-07-16 (complete)2115678SAT 0.860868 0.889637
Choco2.1.1 2009-06-10 (complete)2070860SAT 0.935857 0.953923
Abscon 112v4 AC (complete)2095533SAT 9.2076 9.27707
Abscon 112v4 ESAC (complete)2095534SAT 14.3878 14.5738
pcs 0.3.2 (complete)2070856SAT 81.0107 81.4086
pcs-restart 0.3.2 (complete)2070857SAT 180.442 180.55
SAT4J CSP 2.1.1 (complete)2070855? 151.307 149.722
Sugar v1.14.6+picosat (complete)2070861? 274.602 989.098
Sugar v1.14.6+minisat (complete)2070862? 298.937 310.405
Concrete 2009-07-14 (complete)2070858? (TO) 1800.02 1814.02
Concrete DC 2009-07-14 (complete)2070859? (TO) 1800.03 1812.42

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
7 64 71 71 2 35 2 37 7 71 71 71 44 36 2 6 64 17 2 2 2 2 36 71 71 50 71 71 52 53 10 63 2 2 71 2 16 2 35 46 15 71 2 71 11 71 54 2 44 31 14 62
71 2 2 2 71 71 71 71 2 71 71 71 53 71 71 71 17 71 37 71 39 2 62 71 47 71 2 2 71 71 2 71 2 2 58 2 47 71 71 68 68 2 71 16 2 42 2 2