CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-20/
normalized-primes-20-20-2-7.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-20/
normalized-primes-20-20-2-7.xml
MD5SUM2dc4449fba58f7ec0fed491a75880a0e
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.015997
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints20
Maximum constraint arity9
Maximum domain size70
Number of constraints which are defined in extension0
Number of constraints which are defined in intension20
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2070853SAT 0.015997 0.0226969
bpsolver 09 (complete)2070854SAT 0.043993 0.052291
Choco2.1.1b 2009-07-16 (complete)2115677SAT 0.91086 0.941531
Choco2.1.1 2009-06-10 (complete)2070849SAT 0.952854 0.954055
pcs 0.3.2 (complete)2070845SAT 348.516 351.833
pcs-restart 0.3.2 (complete)2070846SAT 399.808 403.622
SAT4J CSP 2.1.1 (complete)2070844? 150.603 148.535
Sugar v1.14.6+minisat (complete)2070851? 262.849 289.907
Sugar v1.14.6+picosat (complete)2070850? 264.557 293.683
Concrete DC 2009-07-14 (complete)2070848? (TO) 1800.02 1814.82
Concrete 2009-07-14 (complete)2070847? (TO) 1800.09 1818.33
Abscon 112v4 AC (complete)2095531? (TO) 1800.12 1805.26
Abscon 112v4 ESAC (complete)2095532? (TO) 1800.13 1817.23

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
68 71 25 67 58 63 46 34 69 2 2 71 71 71 2 71 2 43 71 71 47 12 71 54 15 2 2 32 6 71 71 2 13 2 29 2 69 23 21 45 48 5 2 71 2 2 14 71 71 71 55 2
71 2 71 2 2 71 2 56 2 2 71 61 36 63 40 2 2 71 2 71 18 71 71 60 2 2 2 2 2 2 71 71 64 63 71 2 55 65 31 71 71 14 71 2 2 2 2 2