CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-20/
normalized-primes-20-40-2-7.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-20/
normalized-primes-20-40-2-7.xml
MD5SUMc11472a69b2442e502c90cd3ff27b6d0
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark72.602
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints40
Maximum constraint arity9
Maximum domain size70
Number of constraints which are defined in extension0
Number of constraints which are defined in intension40
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2070820SAT 72.602 73.207
Choco2.1.1b 2009-07-16 (complete)2115674SAT 131.184 132.476
bpsolver 09 (complete)2070821SAT 164.634 166.047
Choco2.1.1 2009-06-10 (complete)2070816SAT 1716.24 1727.24
SAT4J CSP 2.1.1 (complete)2070811? 151.598 150.803
Sugar v1.14.6+picosat (complete)2070817? 254.065 462.43
Sugar v1.14.6+minisat (complete)2070818? 266.068 277.03
Concrete 2009-07-14 (complete)2070814? (TO) 1800.07 1813.32
Concrete DC 2009-07-14 (complete)2070815? (TO) 1800.07 1808.42
Abscon 112v4 ESAC (complete)2095526? (TO) 1800.1 1814.47
pcs 0.3.2 (complete)2070812? (TO) 1800.13 1816.47
Abscon 112v4 AC (complete)2095525? (TO) 1800.14 1801.45
pcs-restart 0.3.2 (complete)2070813? (TO) 1800.17 1806.46

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
4 2 44 68 21 53 59 14 18 3 20 68 48 24 2 16 71 26 16 53 24 20 2 20 47 46 21 12 31 3 21 16 45 68 25 3 23 49 70 4 2 36 35 17 50 13 68 66 23 24
24 29 2 2 42 45 2 61 71 3 12 71 71 27 22 16 3 9 31 61 2 53 7 24 71 3 71 2 71 19 2 6 49 70 31 35 20 20 37 71 45 31 59 29 54 43 71 41 47 48