CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-20/
normalized-primes-20-80-2-7.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-20/
normalized-primes-20-80-2-7.xml
MD5SUM1485d4647156142b2e4311c149522c96
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.029994
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints80
Maximum constraint arity9
Maximum domain size70
Number of constraints which are defined in extension0
Number of constraints which are defined in intension80
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2070809SAT 0.029994 0.0329161
bpsolver 09 (complete)2070810SAT 0.068989 0.0784571
pcs 0.3.2 (complete)2070801SAT 0.12498 0.12772
pcs-restart 0.3.2 (complete)2070802SAT 0.220965 0.222306
Choco2.1.1 2009-06-10 (complete)2070805SAT 0.813875 0.84166
Choco2.1.1b 2009-07-16 (complete)2115673SAT 0.839872 0.886073
Sugar v1.14.6+minisat (complete)2070807SAT 1.22081 1.3091
Sugar v1.14.6+picosat (complete)2070806SAT 1.23781 1.3689
Abscon 112v4 AC (complete)2095523SAT 2.44363 2.51113
Abscon 112v4 ESAC (complete)2095524SAT 2.6206 2.66872
SAT4J CSP 2.1.1 (complete)2070800? 390.299 390.264
Concrete 2009-07-14 (complete)2070803? (TO) 1800.05 1811.02
Concrete DC 2009-07-14 (complete)2070804? (TO) 1800.08 1814.93

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
7 17 61 53 43 53 17 41 29 3 5 19 31 71 7 17 2 17 41 59 37 23 19 29 5 31 5 7 19 53 29 5 5 67 29 19 43 59 37 5 29 43 3 71 11 61 67 11 53 31 43
17 37 2 59 43 5 31 59 3 13 13 11 19 59 13 17 29 43 61 11 53 5 13 47 19 47 11 7 31 19 23 59 67 23 11 7 37 47 71 41 2 59 23 71 41 17 17 47 71