CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-20/
normalized-primes-20-80-3-5.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-20/
normalized-primes-20-80-3-5.xml
MD5SUM07a44e1cfeebba994ced5ca515590998
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark9.1926
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints80
Maximum constraint arity8
Maximum domain size70
Number of constraints which are defined in extension0
Number of constraints which are defined in intension80
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Choco2.1.1 2009-06-10 (complete)2070794SAT 9.1926 9.4567
Mistral 1.545 (complete)2070798SAT 68.3326 68.9381
Choco2.1.1b 2009-07-16 (complete)2115672SAT 84.4792 85.3067
bpsolver 09 (complete)2070799SAT 109.979 110.028
SAT4J CSP 2.1.1 (complete)2070789? 148.891 147.896
Sugar v1.14.6+minisat (complete)2070796? 243.627 650.606
Sugar v1.14.6+picosat (complete)2070795? 255.248 263.908
Concrete DC 2009-07-14 (complete)2070793? (TO) 1800.03 1814.32
Concrete 2009-07-14 (complete)2070792? (TO) 1800.03 1812.32
Abscon 112v4 AC (complete)2095521? (TO) 1800.1 1811.35
pcs 0.3.2 (complete)2070790? (TO) 1800.15 1816.54
pcs-restart 0.3.2 (complete)2070791? (TO) 1800.15 1817.73
Abscon 112v4 ESAC (complete)2095522? (TO) 1800.15 1806.75

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
7 46 61 53 43 53 17 41 29 3 5 19 31 71 7 17 2 17 41 59 37 23 19 29 5 31 5 7 19 53 29 5 5 67 29 19 43 59 37 5 29 43 3 71 11 61 67 11 53 31 43
17 37 2 59 43 5 31 59 3 13 13 11 19 59 13 17 29 43 61 11 53 5 13 47 19 47 11 7 31 19 23 59 67 23 11 7 37 47 71 41 2 52 23 71 41 17 17 47 71