CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/primes-20/
normalized-primes-20-80-2-5.xml

Jump to solvers results

General information on the benchmark

Namecsp/primes-20/
normalized-primes-20-80-2-5.xml
MD5SUM35cfa0b7fff52fe8490c650f270b3c25
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.023996
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints80
Maximum constraint arity7
Maximum domain size70
Number of constraints which are defined in extension0
Number of constraints which are defined in intension80
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2070776SAT 0.023996 0.0314911
bpsolver 09 (complete)2070777SAT 0.05999 0.0612131
pcs-restart 0.3.2 (complete)2070769SAT 0.080986 0.084014
pcs 0.3.2 (complete)2070768SAT 0.080987 0.085066
Choco2.1.1b 2009-07-16 (complete)2115670SAT 0.801877 0.835219
Choco2.1.1 2009-06-10 (complete)2070772SAT 0.84887 0.913112
Sugar v1.14.6+picosat (complete)2070773SAT 1.06584 1.1528
Sugar v1.14.6+minisat (complete)2070774SAT 1.07683 1.16559
Abscon 112v4 ESAC (complete)2095518SAT 2.16667 2.19834
Abscon 112v4 AC (complete)2095517SAT 2.34764 2.40231
SAT4J CSP 2.1.1 (complete)2070767? 790.023 795.683
Concrete DC 2009-07-14 (complete)2070771? (TO) 1800.03 1812.72
Concrete 2009-07-14 (complete)2070770? (TO) 1800.04 1812.42

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
7 17 61 71 43 53 17 41 29 3 5 19 31 71 7 17 2 17 41 59 37 23 19 29 5 31 5 7 19 53 29 5 5 67 29 19 43 59 37 5 29 43 3 71 11 61 67 11 53 31 43
17 2 2 59 43 5 31 59 3 13 13 11 19 59 13 17 29 43 61 11 53 5 13 47 19 47 11 7 31 19 23 59 67 23 11 7 37 47 71 41 2 59 23 71 41 17 17 47 71